Opening this block

Home · Don Valley West · Mount Pleasant Rd

What's new around 515 Mount Pleasant Rd

515 Mount Pleasant Rd · Don Valley West. Within 1 km.

New shops

Licences since July 2025. The date is when the city approved it, not the opening day.

Show 21 moreShow fewer

Being built

The city has allowed these. Work may not have started. The permits in this area list 1167 homes.

Laneway suite

34 Hadley Rd

187 m away · 34 Hadley Rd · Don Valley West

Approved 17 Dec 2025

1 new home

The permit lists 1 homes.

Proposal to construct a new detached laneway suite.

Laneway suite

281 Davisville Ave

215 m away · 281 Davisville Ave · Don Valley West

Approved 1 Dec 2025

1 new home

The permit lists 1 homes.

Proposed rear 2 storey laneway suite

4 homes

281 Davisville Ave

215 m away · 281 Davisville Ave · Don Valley West

Approved 31 Dec 2025

4 new homes · Modcity Construction Ltd

The permit lists 4 homes.

Proposed new construction of 4 unit detached dwelling (fourplex)

Show 21 moreShow fewer
Multiple Unit Building

598 Mount Pleasant Rd

215 m away · 598 Mount Pleasant Rd · Toronto-St. Paul's

Approved 24 Jul 2026

Rear addition. Commercial building. Ground floor medical office; second storey office

Apartment

289 Balliol St

333 m away · 289 Balliol St · Toronto-St. Paul's

Approved 17 Apr 2026

REV 01: Proposed to alter approved shoring design to include tiebacks into municipal right of wayPart Permit - Proposal to construct 32-Storey rental residential apartment building with level of underground parking

New house

11 Oswald Cres

425 m away · 11 Oswald Cres · Toronto-St. Paul's

Approved 11 Sep 2026

2 new homes · 16230288 Canada Inc

The permit lists 2 homes.

TO CONSTRUCT A NEW TWO STOREY DUPLEX

Multiple Unit Building

688 Mount Pleasant Rd

459 m away · 688 Mount Pleasant Rd · Toronto-St. Paul's

Approved 6 Nov 2026

Revision 01: New scope includes full interior renovation of the basement and ground floors including architectural, structural, hvac, electrical and plumbing and drainage for personal Service Shop (Beauty…

New house

12 Cuthbert Cres

506 m away · 12 Cuthbert Cres · Toronto-St. Paul's

Approved 20 May 2025

2 new homes

The permit lists 2 homes.

Proposal to construct a new 2 unit semi detached house - related to 24 193610 BLD 00 NH

New house

131 Hillsdale Ave E

564 m away · 131 Hillsdale Ave E · Toronto-St. Paul's

Approved 23 Jul 2026

Nikan Sharif-zadeh

REV 02: REVISION TO BASEMENT LAYOUT. MINOR CHANGES TO WALKOUT, MAIN & 2ND FLOOR INDICATED WITH REVISION CLOUDS.Proposal to construct a new 2 storey single family dwelling and demolish the existing 2 storey single family…

New house

29 Taunton Rd

572 m away · 29 Taunton Rd · Don Valley West

Approved 26 Sep 2025

1 new home · Michelle Basu Roy

The permit lists 1 homes.

Fire damage dwelling to be rebuilt from ground to third floor including front porch, a new walk out to be constructed, Existing basement/foundation walls and concrete slab-on-grade. Front porch concrete steps to remain

Apartment

18 Brownlow Ave

590 m away · 18 Brownlow Ave · Toronto-St. Paul's

Approved 23 Jun 2026

194 new homes

The permit lists 194 homes.

Application to construct a 27 storey purpose built residential building with 194 dwelling units and 3 levels of below grade parking garage (Below grade connections to existing parking garage to the property to the west-…

New house

362 Soudan Ave

600 m away · 362 Soudan Ave · Don Valley West

Approved 22 Apr 2025

1 new home

The permit lists 1 homes.

Proposal for demolition of existing house and construction of new 3 storey detached single family dwelling and detached garage

Laneway suite

362 Soudan Ave

600 m away · 362 Soudan Ave · Don Valley West

Approved 3 Sep 2025

1 new home

The permit lists 1 homes.

2 storey wood frame garden suite with one car garage beneath

Multiple Unit Building

140 Merton St

603 m away · 140 Merton St · Toronto-St. Paul's

Approved 18 Jun 2026

Rev 01: Revision to Architectural floor assemblies, Structural and Heritage Drawings.Interior/Exterior alteration for retained heritage component of existing building

Apartment

140 Merton St

603 m away · 140 Merton St · Toronto-St. Paul's

Approved 22 Jul 2026

Part Permit - The Indigenous organization, the Missanabie Cree First Nation, will be developing the site at 140 Merton Street, dedicating the project to housing options for Indigenous elders and other seniors.It will…

Multiple Unit Building

1995 Yonge St

776 m away · 1995 Yonge St · Toronto-St. Paul's

Approved 20 Mar 2026

Rev 01 - Change of Use from A2 to C occupancy on 2nd floor, and interior alterations of an existing suite including architectural, HVAC, plumbing, and electrical work.Proposal for interior alterations of existing suite.

Multiple Unit Building

1951 Yonge St

795 m away · 1951 Yonge St · Toronto-St. Paul's

Approved 21 May 2026

Shoring and excavation for remediation purposes

1 homes

176 Eglinton Ave E

825 m away · 176 Eglinton Ave E · Toronto-St. Paul's

Approved 9 Oct 2026

1 new home

The permit lists 1 homes.

Reconstruction of the existing deck and exterior stairs, including the construction of new reinforced concrete masonry unit (CMU) walls to support the new deck.

Apartment

30 Merton St

850 m away · 30 Merton St · Toronto-St. Paul's

Approved 6 Oct 2025

322 new homes

The permit lists 322 homes.

37 storey mixed use building containing commercial uses on the ground floor, 322 dwelling units, two level mechanical penthouse, indoor and outdoor amenity areas and three levels of underground parking.

Mixed Use/res W Non Res

30 Merton St

850 m away · 30 Merton St · Toronto-St. Paul's

Approved 16 Mar 2026

Revision 01: Proposal to revision transformer room and elevator level - see letters for details37 storey mixed use building containing commercial uses on the ground floor, 322 dwelling units, two level mechanical…

New house

44 Banff Rd

870 m away · 44 Banff Rd · Don Valley West

Approved 1 Apr 2026

1 new home · Jordan Tarshis

The permit lists 1 homes.

Proposal to construct a new 1 storey SFD-detached dwelling. Parts of existing dwelling to be underpinned and convert garage to livable space at rear.See also 25 214601 ZAP.

Coming down

The city has allowed these buildings to come down. They may still be standing.

Demolition

295 Balliol St

328 m away · 295 Balliol St · Toronto-St. Paul's

Approved 7 Mar 2025

Demolish an existing 2-storey semi-detached building on the lands municipally known as 293-295 Balliol Street. The lands will be later improved with the construction of a residential apartment building as noted in the…

Demolition

180 Merton St

561 m away · 180 Merton St · Toronto-St. Paul's

Approved 4 Jun 2026

Proposed demolition of row of townhouses/buildings to accommodate proposed project for 45-storey mixed-use residential building - Re: 170/180 Merton St

Show 9 moreShow fewer
Demolition

140 Merton St

603 m away · 140 Merton St · Toronto-St. Paul's

Approved 16 Mar 2026

The proposed development involves the demolition of the existing building and parking lot, and the construction of a 28-storey mixed use building with underground parking, outdoor amenity spaces, pedestrian walkways, a…

Demolition

61 Brownlow Ave

644 m away · 61 Brownlow Ave · Toronto-St. Paul's

Approved 24 Sep 2025

Demolishing the townhouse for the construction of a residential apartment building.(61-75 Brownlow Avenue)

Demolition

68 Soudan Ave

745 m away · 68 Soudan Ave · Toronto-St. Paul's

Approved 22 Jan 2025

Demolish the existing two storey semi-detached dwelling for City Parkland Dedication

Demolition

66 Soudan Ave

749 m away · 66 Soudan Ave · Toronto-St. Paul's

Approved 22 Jan 2025

Demolish the existing two storey semi-detached dwelling for City Parkland Dedication

Demolition

64 Soudan Ave

753 m away · 64 Soudan Ave · Toronto-St. Paul's

Approved 22 Jan 2025

Demolish the existing two storey semi-detached dwelling for City Parkland Dedication

Demolition

62 Soudan Ave

757 m away · 62 Soudan Ave · Toronto-St. Paul's

Approved 22 Jan 2025

Demolish the existing two storey semi-detached dwelling for City Parkland Dedication

Demolition

60 Soudan Ave

760 m away · 60 Soudan Ave · Toronto-St. Paul's

Approved 22 Jan 2025

Demolish the existing two storey dwelling for City Parkland Dedication

Demolition

21 Imperial St

859 m away · 21 Imperial St · Toronto-St. Paul's

Approved 23 Oct 2026

Proposal to demolish the existing 2 storey office building located at 21 IMPERIAL ST only.

Demolition

25 Imperial St

873 m away · 25 Imperial St · Toronto-St. Paul's

Approved 23 Oct 2026

Proposed demolition of the existing 5-storey commercial building.

Loud nights

Hours the city has already allowed.

Continuous Concrete Pour

8 Brownlow Avenue (northwest Of Brownlow And Souda

548 m away · 8 Brownlow Ave · Toronto-St. Paul's

Allowed 1 May 2026 – 30 Oct 2026

Hours 7:00 a.m.–12:30 a.m.

Soudan-brownlow Properties

Continuous Concrete Pour

140 Merton Street Development

603 m away · 140 Merton St · Toronto-St. Paul's

Allowed 17 Nov 2026 – 17 May 2027

Hours 7:00 a.m.–11:59 p.m.

Ellisdon Residential Inc.

Continuous Concrete Pour

30 Merton

850 m away · 30 Merton St · Toronto-St. Paul's

Allowed 2 Jul 2026 – 31 Dec 2026

Hours 7:00 a.m.–11:59 p.m.

Skygrid Construction Inc.

Show 4 moreShow fewer
Construction

Canada Square Office Retrofit

928 m away · 2180 Yonge St · Toronto-St. Paul's

Allowed 10 Jul 2026 – 31 Oct 2026

Hours 7:00 p.m.–11:00 p.m.

Setup 8 Jun 2026 – 27 Jun 2026, 7:00 p.m.–11:00 p.m.

Tear down 24 Mar 2027 – 5 Apr 2027, 7:00 p.m.–11:00 p.m.

Ellisdon Corporation

Construction

Canada Square Office Retrofit

928 m away · 2180 Yonge St · Toronto-St. Paul's

Allowed 1 Nov 2026 – 30 Jun 2027

Hours from 7:00 p.m.

Ellisdon Corporation

Continuous Concrete Pour

The One Seventy

1.0 km away · 170 Roehampton Ave · Toronto-St. Paul's

Allowed 7 Aug 2026 – 7 Feb 2027

Hours from 7:00 p.m.

Clark Construction Management Inc.

Plans you can answer

Someone has asked the city for a change. Nothing here is a decision.

Site plan

551 Mount Pleasant Rd

120 m away · 551 Mount Pleasant Rd · Don Valley West

Asked 3 Feb 2023

Under Review

Proposal to fully renovate and partially reconstruct the existing theatre. The existing historic front (west) facade fronting on Mount Pleasant Road will be retained. Construction plans include a new roof, full/new excavated basement, replacing the north, east and south walls, and full interior renovation. A new, 3…

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Diane Pi · [email protected].

Site plan

276 Merton St

426 m away · 276 Merton St · Toronto-St. Paul's

Asked 16 Sep 2020

Under Review

INACTIVE Site Plan application to permit a 13-storey building (49.65 metres to the top of the mechanical penthouse). The proposal includes 91 residential units as well as 58 parking spaces (reduced from 92) in a two- level underground parking garage (reduced from 3-levels).

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Shane Taylor · [email protected].

Site plan

141 Davisville Ave

469 m away · 141 Davisville Ave · Toronto-St. Paul's

Asked 22 Jun 2022

Under Review

Proposed 32-storey infill tower. The existing 20-storey. 313-unit rental apartment building currently on site will be retained. The proposed building will include approximately 423 new dwelling units (in a mix of studio, one-bedroom, two-bedroom, and three-bedroom units) across 24,026 square metres of residential…

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Holli Butrimas · [email protected].

Show 21 moreShow fewer
Site plan

275 Merton St

481 m away · 275 Merton St · Toronto-St. Paul's

Asked 20 May 2025

NOAC Issued

Site Plan for a 40-storey mixed use purpose built rental building with 494 dwelling units, of which 30% will be affordable rental units. A total gross floor area (GFA) of 31,321 m2 is proposed, including 132 m2 of ground floor non-residential GFA.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Abraham Plunkett-Latimer · [email protected].

Site plan

185 Balliol St

498 m away · 185 Balliol St · Toronto-St. Paul's

Asked 15 Sep 2020

Under Review

INACTIVE Application for Site Plan Approval of a proposed 35-storey mixed rental residential building, with retail at-grade along Pailton Cres, approximately 437 (previously 449 units) and 32.017.60m2 of GFA (previosuly 33,395m2 of GFA)

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Shane Taylor · [email protected].

Site plan

218 Merton St

511 m away · 218 Merton St · Toronto-St. Paul's

Asked 28 Apr 2022

Under Review

Site Plan Approval for a 40-storey mixed-use building having a non-residential gross floor area of 347.1 square metres, and a residential gross floor area of 28,700 square metres. 434 residential dwelling units are proposed.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Shane Taylor · [email protected].

Rezoning

216 Soudan Ave

520 m away · 216 Soudan Ave · Toronto-St. Paul's

Asked 13 Nov 2024

Under Review

Zoning By-law Amendment for a 45-storey purpose built rental residential building containing 527 new dwelling units, and a total of 32,900.29 sq. m of residential gross floor area (GFA).

How to respond

You can send a written comment to the city planner, and you can ask to speak when this ward's community council hears the rezoning. That council recommends. City Council makes the decision.

Next sitting on the published 2026 schedule: Toronto and East York Community Council, 25 Nov 2026, 9:30 a.m., Committee Room 1, Toronto City Hall.

Write Patrick Miller · [email protected].

Site plan

180 Merton St

561 m away · 180 Merton St · Toronto-St. Paul's

Asked 14 Mar 2025

Under Review

Site Plan Approval for a 36-storey mixed-use residential building, which includes the partial retention of the existing heritage building at 170 Merton Street. Overall, the proposal includes a total of 400 residential dwelling units and approximately 31,954 square metres of gross floor area, including 198.4 square…

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Holli Butrimas · [email protected].

Site plan

158 Soudan Ave

579 m away · 158 Soudan Ave · Toronto-St. Paul's

Asked 26 Mar 2025

Under Review

Site Plan Control for a 56-storey residential tower that will have a total of 46,547 square metres of residential gross floor area ("GFA") and a total of 674 total dwelling units (including the 13 required rental replacement units). See Related Rezoning file (25 135273 STE 12 OZ) Jan 2026 Revised Submission - Zoning…

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Patrick Miller · [email protected].

Subdivision

155 Balliol St

588 m away · 155 Balliol St · Toronto-St. Paul's

Asked 14 Oct 2021

Under Review

Draft Plan of Subdivision for 3 lots.

How to respond

You can send a written comment, and you can ask to speak at community council. City Council decides a plan of subdivision.

Next sitting on the published 2026 schedule: Toronto and East York Community Council, 25 Nov 2026, 9:30 a.m., Committee Room 1, Toronto City Hall.

Write Shane Taylor · [email protected].

Site plan

155 Balliol St

588 m away · 155 Balliol St · Toronto-St. Paul's

Asked 14 Oct 2021

NOAC Issued

Site Plan Approval for a 37-storey mixed-use building having a non-residential gross floor area of 137 square metres and a residential gross floor area of 31095square metres. A total of 442 new residential dwelling units are proposed.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Shane Taylor · [email protected].

Site plan

18 Brownlow Ave

590 m away · 18 Brownlow Ave · Toronto-St. Paul's

Asked 23 Jul 2025

NOAC Issued

Site Plan Amendment to alter the development standards for the 21-storey residential building (previously approved under 23 152381 STE 12 SA), by increasing the height and number of storeys (from 21-storeys to 26-storeys), increasing the permitted gross floor area and permitted projections, revising minimum setbacks…

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Shane Taylor · [email protected].

Site plan

733 Mount Pleasant Rd

599 m away · 733 Mount Pleasant Rd · Don Valley West

Asked 27 Oct 2020

NOAC Issued

Site Plan Control application to permit a 27-storey mixed use building containing 325 residential units and 258.7 square metres of retail gross floor area on the ground floor

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Diane Pi · [email protected].

Rezoning

732 Mount Pleasant Rd

599 m away · 732 Mount Pleasant Rd · Toronto-St. Paul's

Asked 17 Apr 2026

Under Review

Zoning By-law Amendment application to allow for the development of a 36-storey mixed-use building comprised of a 4-storey podium and a 32-storey tower element. The proposed building includes approximately 65 square metres of non-reisdential space at grade and 396 residential dwelling units.

How to respond

You can send a written comment to the city planner, and you can ask to speak when this ward's community council hears the rezoning. That council recommends. City Council makes the decision.

Next sitting on the published 2026 schedule: Toronto and East York Community Council, 25 Nov 2026, 9:30 a.m., Committee Room 1, Toronto City Hall.

Write Patrick Miller · [email protected].

Site plan

758 Mount Pleasant Rd

644 m away · 758 Mount Pleasant Rd · Toronto-St. Paul's

Asked 5 Jul 2021

Under Review

Site Plan Approval for a 35-storey mixed-use building comprised of a 6-storey base building, and a 29-storey tower element. The proposed non-residential gross floor area is 208.37 square metres, and the proposed residential gross floor area is 28,692.73 square metres. A total of 398 residential dwelling units are…

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Patrick Miller · [email protected].

Rezoning

758 Mount Pleasant Rd

644 m away · 758 Mount Pleasant Rd · Toronto-St. Paul's

Asked 23 Apr 2026

Under Review

Zoning By-law Amendment application to allow for the development of a 56-storey mixed-use building comprised of a 4-storey podium and a 52-storey tower element. The proposed building includes approximately 65 square metres of non-reisdential space at grade and 618 residential dwelling units.The site was subject to a…

How to respond

You can send a written comment to the city planner, and you can ask to speak when this ward's community council hears the rezoning. That council recommends. City Council makes the decision.

Next sitting on the published 2026 schedule: Toronto and East York Community Council, 25 Nov 2026, 9:30 a.m., Committee Room 1, Toronto City Hall.

Write Patrick Miller · [email protected].

Site plan

61 Brownlow Ave

644 m away · 61 Brownlow Ave · Toronto-St. Paul's

Asked 25 Aug 2021

NOAC Issued

Site Plan application to permit a residential building with two towers, 59 and 55 storeys , comprising 1,374 residential units, daycare facility and a gross floor area of 97,194 square metres. The proposal involves rental replacement.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Shane Taylor · [email protected].

Condominium plan

61 Brownlow Ave

644 m away · 61 Brownlow Ave · Toronto-St. Paul's

Asked 10 Sep 2021

Under Review

*** Draft Plan of Standard Condominium to permit 384 residential units in a 35-storey residential building with a 2-level underground parking garage containing 69 vehicular parking spaces.

How to respond

This is a condominium plan, usually tied to a rezoning. A written comment goes to the city planner. Height and use are argued on the rezoning, when there is one.

Write Cameron Williamson · [email protected].

Site plan

33 Davisville Ave

727 m away · 33 Davisville Ave · Toronto-St. Paul's

Asked 14 Jun 2022

Under Review

Site Plan Approval for proposed 6-storey (22.5 metre) base building and 33-storey tower element, which will have a total height of 125.0 metres to the top of the roof and 132.0 metres to the top of the mechanical penthouse. The building will contain total of 526 residential dwelling units and 30,786 square metres of…

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Holli Butrimas · [email protected].

Site plan

181 Eglinton Ave E

743 m away · 181 Eglinton Ave E · Toronto-St. Paul's

Asked 14 Jul 2022

Under Review

Site Plan Application for proposed 21-storey buidling and three-levels of underground parking, excluding mechanical penthouse. The proposal includes 11,242.7 square metres of residential and 237.4 square metres of retail use. The building includes 139 unit and 23 vehicular parking spaces.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Shane Taylor · [email protected].

Rezoning

191 Eglinton Ave E

744 m away · 191 Eglinton Ave E · Toronto-St. Paul's

Asked 14 Jul 2022

Appeal Received

Rezoning for proposed 40-storey tower with an 8-storey podium and three-levels of underground parking. The proposal incorporates residential, retail, and office uses, and will replace the existing commercial/retail spaces. The building includes 479 units, 164 vehicular parking spaces, and 504 bicycle parking spaces.

How to respond

This file is at the Ontario Land Tribunal. The next community council sitting is not the hearing.

Write Shane Taylor · [email protected].

Site plan

191 Eglinton Ave E

744 m away · 191 Eglinton Ave E · Toronto-St. Paul's

Asked 6 Mar 2025

Under Review

Site Plan approval application for a 40-storey tower with an 8-storey podium and three-levels of underground parking. The proposal incorporates residential, retail, and office uses, and will replace the existing commercial/retail spaces. The building includes 479 units, 164 vehicular parking spaces, and 504 bicycle…

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Shane Taylor · [email protected].

Site plan

2045 Yonge St

780 m away · 2045 Yonge St · Toronto-St. Paul's

Asked 22 Aug 2022

Under Review

Proposed redevelopment of the site for an 11-storey mixed-use building fronting onto Yonge Street, and connected to seven 3-storey townhouse units fronting onto Tullis Drive.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Cameron Williamson · [email protected].