Midtown Med Spa
37 m away · 567 Mount Pleasant Rd · Don Valley West
Approved 24 Sep 2026
Opening this block
Home · Don Valley West · Mount Pleasant Rd
551 Mount Pleasant Rd · Don Valley West. Within 1 km.
Licences since July 2025. The date is when the city approved it, not the opening day.
37 m away · 567 Mount Pleasant Rd · Don Valley West
Approved 24 Sep 2026
105 m away · 595 Mount Pleasant Rd · Don Valley West
Approved 15 Jun 2026
105 m away · 521 Mount Pleasant Rd · Don Valley West
Approved 3 Oct 2026
116 m away · 517 Mount Pleasant Rd · Don Valley West
Approved 19 Jul 2025
120 m away · 515 Mount Pleasant Rd · Don Valley West
Approved 11 Apr 2026
168 m away · 505 Mount Pleasant Rd · Don Valley West
Approved 8 Oct 2026
177 m away · 623 Mount Pleasant Rd · Don Valley West
Approved 3 Oct 2025
232 m away · 643A Mount Pleasant Rd · Don Valley West
Approved 23 Oct 2026
274 m away · 647 Mount Pleasant Rd · Don Valley West
Approved 14 Jul 2025
303 m away · 667 Mount Pleasant Rd · Don Valley West
Approved 13 Apr 2026
383 m away · 693 Mount Pleasant Rd · Don Valley West
Approved 24 Sep 2025
430 m away · 711 Mount Pleasant Rd · Don Valley West
Approved 5 Nov 2025
527 m away · 758 Mount Pleasant Rd · Toronto-St. Paul's
Approved 30 Mar 2026
595 m away · 230 Merton St · Toronto-St. Paul's
Approved 25 Aug 2025
645 m away · 323 Eglinton Ave E · Don Valley West
Approved 22 Dec 2025
660 m away · 250 Eglinton Ave E · Toronto-St. Paul's
Approved 27 Mar 2026
681 m away · 220 Eglinton Ave E · Toronto-St. Paul's
Approved 14 Sep 2026
713 m away · 180 Eglinton Ave E · Toronto-St. Paul's
Approved 11 Jun 2026
714 m away · 188 Eglinton Ave E · Toronto-St. Paul's
Approved 1 Sep 2026
717 m away · 379 Eglinton Ave E · Don Valley West
Approved 19 Aug 2025
720 m away · 381 Eglinton Ave E · Don Valley West
Approved 11 May 2026
726 m away · 77 Dunfield Ave · Toronto-St. Paul's
Approved 26 Jan 2026
727 m away · 383 Eglinton Ave E · Don Valley West
Approved 25 May 2026
762 m away · 5 Manor Rd E · Toronto-St. Paul's
Approved 13 Mar 2026
The city has allowed these. Work may not have started. The permits in this area list 2258 homes.
72 m away · 34 Hadley Rd · Don Valley West
Approved 17 Dec 2025
1 new home
The permit lists 1 homes.
Proposal to construct a new detached laneway suite.
108 m away · 598 Mount Pleasant Rd · Toronto-St. Paul's
Approved 24 Jul 2026
Rear addition. Commercial building. Ground floor medical office; second storey office
327 m away · 281 Davisville Ave · Don Valley West
Approved 1 Dec 2025
1 new home
The permit lists 1 homes.
Proposed rear 2 storey laneway suite
327 m away · 281 Davisville Ave · Don Valley West
Approved 31 Dec 2025
4 new homes · Modcity Construction Ltd
The permit lists 4 homes.
Proposed new construction of 4 unit detached dwelling (fourplex)
343 m away · 688 Mount Pleasant Rd · Toronto-St. Paul's
Approved 6 Nov 2026
Revision 01: New scope includes full interior renovation of the basement and ground floors including architectural, structural, hvac, electrical and plumbing and drainage for personal Service Shop (Beauty…
406 m away · 11 Oswald Cres · Toronto-St. Paul's
Approved 11 Sep 2026
2 new homes · 16230288 Canada Inc
The permit lists 2 homes.
TO CONSTRUCT A NEW TWO STOREY DUPLEX
451 m away · 289 Balliol St · Toronto-St. Paul's
Approved 17 Apr 2026
REV 01: Proposed to alter approved shoring design to include tiebacks into municipal right of wayPart Permit - Proposal to construct 32-Storey rental residential apartment building with level of underground parking
452 m away · 29 Taunton Rd · Don Valley West
Approved 26 Sep 2025
1 new home · Michelle Basu Roy
The permit lists 1 homes.
Fire damage dwelling to be rebuilt from ground to third floor including front porch, a new walk out to be constructed, Existing basement/foundation walls and concrete slab-on-grade. Front porch concrete steps to remain
456 m away · 154 Davisville Ave · Toronto-St. Paul's
Approved 26 Nov 2025
Proposal to construct new 1 storey garden suite with basement
482 m away · 18 Brownlow Ave · Toronto-St. Paul's
Approved 23 Jun 2026
194 new homes
The permit lists 194 homes.
Application to construct a 27 storey purpose built residential building with 194 dwelling units and 3 levels of below grade parking garage (Below grade connections to existing parking garage to the property to the west-…
495 m away · 362 Soudan Ave · Don Valley West
Approved 22 Apr 2025
1 new home
The permit lists 1 homes.
Proposal for demolition of existing house and construction of new 3 storey detached single family dwelling and detached garage
495 m away · 362 Soudan Ave · Don Valley West
Approved 3 Sep 2025
1 new home
The permit lists 1 homes.
2 storey wood frame garden suite with one car garage beneath
508 m away · 131 Hillsdale Ave E · Toronto-St. Paul's
Approved 23 Jul 2026
Nikan Sharif-zadeh
REV 02: REVISION TO BASEMENT LAYOUT. MINOR CHANGES TO WALKOUT, MAIN & 2ND FLOOR INDICATED WITH REVISION CLOUDS.Proposal to construct a new 2 storey single family dwelling and demolish the existing 2 storey single family…
514 m away · 12 Cuthbert Cres · Toronto-St. Paul's
Approved 20 May 2025
2 new homes
The permit lists 2 homes.
Proposal to construct a new 2 unit semi detached house - related to 24 193610 BLD 00 NH
693 m away · 140 Merton St · Toronto-St. Paul's
Approved 18 Jun 2026
Rev 01: Revision to Architectural floor assemblies, Structural and Heritage Drawings.Interior/Exterior alteration for retained heritage component of existing building
693 m away · 140 Merton St · Toronto-St. Paul's
Approved 22 Jul 2026
Part Permit - The Indigenous organization, the Missanabie Cree First Nation, will be developing the site at 140 Merton Street, dedicating the project to housing options for Indigenous elders and other seniors.It will…
718 m away · 176 Eglinton Ave E · Toronto-St. Paul's
Approved 9 Oct 2026
1 new home
The permit lists 1 homes.
Reconstruction of the existing deck and exterior stairs, including the construction of new reinforced concrete masonry unit (CMU) walls to support the new deck.
741 m away · 89 Dunfield Ave · Toronto-St. Paul's
Approved 5 Mar 2026
Proposal for waterproofing and concrete repairs
780 m away · 44 Banff Rd · Don Valley West
Approved 1 Apr 2026
1 new home · Jordan Tarshis
The permit lists 1 homes.
Proposal to construct a new 1 storey SFD-detached dwelling. Parts of existing dwelling to be underpinned and convert garage to livable space at rear.See also 25 214601 ZAP.
788 m away · 1995 Yonge St · Toronto-St. Paul's
Approved 20 Mar 2026
Rev 01 - Change of Use from A2 to C occupancy on 2nd floor, and interior alterations of an existing suite including architectural, HVAC, plumbing, and electrical work.Proposal for interior alterations of existing suite.
830 m away · 1951 Yonge St · Toronto-St. Paul's
Approved 21 May 2026
Shoring and excavation for remediation purposes
832 m away · 2161 Yonge St · Toronto-St. Paul's
Approved 22 Jul 2025
31 new homes
The permit lists 31 homes.
REVISION - to add 3 additional floorsProposal to construct a new 35 storey mixed use building with 304 dwelling units, office and retail space and 5 levels of underground parking. See also 17 1862503 SA
840 m away · 413 Roehampton Ave · Don Valley West
Approved 7 Aug 2026
Revision 01: See attached cover letter. Proposed construction of new 3-storey (28-units) residential condominium with 2-storey below grade (1-storey residential and 1-storey parking garage)
843 m away · 2191 Yonge St · Toronto-St. Paul's
Approved 1 May 2026
Proposal for interior alterations to first floor and third floor amenities area
The city has allowed these buildings to come down. They may still be standing.
406 m away · 11 Oswald Cres · Toronto-St. Paul's
Approved 17 Sep 2026
Hirman Architect Inc
TO CONSTRUCT A NEW TWO STOREY DUPLEX
447 m away · 295 Balliol St · Toronto-St. Paul's
Approved 7 Mar 2025
Demolish an existing 2-storey semi-detached building on the lands municipally known as 293-295 Balliol Street. The lands will be later improved with the construction of a residential apartment building as noted in the…
530 m away · 61 Brownlow Ave · Toronto-St. Paul's
Approved 24 Sep 2025
Demolishing the townhouse for the construction of a residential apartment building.(61-75 Brownlow Avenue)
660 m away · 180 Merton St · Toronto-St. Paul's
Approved 4 Jun 2026
Proposed demolition of row of townhouses/buildings to accommodate proposed project for 45-storey mixed-use residential building - Re: 170/180 Merton St
681 m away · 68 Soudan Ave · Toronto-St. Paul's
Approved 22 Jan 2025
Demolish the existing two storey semi-detached dwelling for City Parkland Dedication
685 m away · 66 Soudan Ave · Toronto-St. Paul's
Approved 22 Jan 2025
Demolish the existing two storey semi-detached dwelling for City Parkland Dedication
689 m away · 64 Soudan Ave · Toronto-St. Paul's
Approved 22 Jan 2025
Demolish the existing two storey semi-detached dwelling for City Parkland Dedication
693 m away · 140 Merton St · Toronto-St. Paul's
Approved 16 Mar 2026
The proposed development involves the demolition of the existing building and parking lot, and the construction of a 28-storey mixed use building with underground parking, outdoor amenity spaces, pedestrian walkways, a…
694 m away · 62 Soudan Ave · Toronto-St. Paul's
Approved 22 Jan 2025
Demolish the existing two storey semi-detached dwelling for City Parkland Dedication
698 m away · 60 Soudan Ave · Toronto-St. Paul's
Approved 22 Jan 2025
Demolish the existing two storey dwelling for City Parkland Dedication
886 m away · 21 Imperial St · Toronto-St. Paul's
Approved 23 Oct 2026
Proposal to demolish the existing 2 storey office building located at 21 IMPERIAL ST only.
900 m away · 25 Imperial St · Toronto-St. Paul's
Approved 23 Oct 2026
Proposed demolition of the existing 5-storey commercial building.
0.9 km away · 383 Cleveland St · Don Valley West
Approved 8 Jan 2026
389 Cleveland Street Lp
Proposal to demolish 6 residential properties and construct a new 14-storey mixed-use building.See also 25-171584 NNY 15 MV
1.0 km away · 385 Cleveland St · Don Valley West
Approved 8 Jan 2026
389 Cleveland Street Lp
Proposal to demolish 4 residential properties + church and office building and construct a new 14-storey mixed-use building.See also 25-171584 NNY 15 MV.See 25-210326 DEM @ 383 Cleveland
1.0 km away · 387 Cleveland St · Don Valley West
Approved 8 Jan 2026
389 Cleveland Street Lp
Proposal to demolish 4 residential properties + church and office building and construct a new 14-storey mixed-use building..See also 25-171584 NNY 15 MV
1.0 km away · 503 Eglinton Ave E · Don Valley West
Approved 7 Jan 2026
389 Cleveland Street Lp
Proposal to demolish church and office building and construct a new 14-storey mixed-use building.See also 25-171584 NNY 15 MV
Hours the city has already allowed.
439 m away · 8 Brownlow Ave · Toronto-St. Paul's
Allowed 1 May 2026 – 30 Oct 2026
Hours 7:00 a.m.–12:30 a.m.
Soudan-brownlow Properties
693 m away · 140 Merton St · Toronto-St. Paul's
Allowed 17 Nov 2026 – 17 May 2027
Hours 7:00 a.m.–11:59 p.m.
Ellisdon Residential Inc.
861 m away · 170 Roehampton Ave · Toronto-St. Paul's
Allowed 7 Aug 2026 – 7 Feb 2027
Hours from 7:00 p.m.
Clark Construction Management Inc.
861 m away · 170 Roehampton Ave · Toronto-St. Paul's
Allowed 21 Oct 2026 – 21 Jan 2027
Hours from 6:00 a.m.
Clark Construction Management Inc.
877 m away · 2180 Yonge St · Toronto-St. Paul's
Allowed 10 Jul 2026 – 31 Oct 2026
Hours 7:00 p.m.–11:00 p.m.
Setup 8 Jun 2026 – 27 Jun 2026, 7:00 p.m.–11:00 p.m.
Tear down 24 Mar 2027 – 5 Apr 2027, 7:00 p.m.–11:00 p.m.
Ellisdon Corporation
877 m away · 2180 Yonge St · Toronto-St. Paul's
Allowed 1 Nov 2026 – 30 Jun 2027
Hours from 7:00 p.m.
Ellisdon Corporation
922 m away · 30 Merton St · Toronto-St. Paul's
Allowed 2 Jul 2026 – 31 Dec 2026
Hours 7:00 a.m.–11:59 p.m.
Skygrid Construction Inc.
Someone has asked the city for a change. Nothing here is a decision.
0 m away · 551 Mount Pleasant Rd · Don Valley West
Asked 3 Feb 2023
Under Review
Proposal to fully renovate and partially reconstruct the existing theatre. The existing historic front (west) facade fronting on Mount Pleasant Road will be retained. Construction plans include a new roof, full/new excavated basement, replacing the north, east and south walls, and full interior renovation. A new, 3…
Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.
Write Diane Pi · [email protected].
409 m away · 216 Soudan Ave · Toronto-St. Paul's
Asked 13 Nov 2024
Under Review
Zoning By-law Amendment for a 45-storey purpose built rental residential building containing 527 new dwelling units, and a total of 32,900.29 sq. m of residential gross floor area (GFA).
You can send a written comment to the city planner, and you can ask to speak when this ward's community council hears the rezoning. That council recommends. City Council makes the decision.
Next sitting on the published 2026 schedule: Toronto and East York Community Council, 25 Nov 2026, 9:30 a.m., Committee Room 1, Toronto City Hall.
431 m away · 19 Brownlow Ave · Toronto-St. Paul's
Asked 22 Jul 2022
Under Review
Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.
480 m away · 733 Mount Pleasant Rd · Don Valley West
Asked 27 Oct 2020
NOAC Issued
Site Plan Control application to permit a 27-storey mixed use building containing 325 residential units and 258.7 square metres of retail gross floor area on the ground floor
Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.
Write Diane Pi · [email protected].
482 m away · 18 Brownlow Ave · Toronto-St. Paul's
Asked 23 Jul 2025
NOAC Issued
Site Plan Amendment to alter the development standards for the 21-storey residential building (previously approved under 23 152381 STE 12 SA), by increasing the height and number of storeys (from 21-storeys to 26-storeys), increasing the permitted gross floor area and permitted projections, revising minimum setbacks…
Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.
482 m away · 732 Mount Pleasant Rd · Toronto-St. Paul's
Asked 17 Apr 2026
Under Review
Zoning By-law Amendment application to allow for the development of a 36-storey mixed-use building comprised of a 4-storey podium and a 32-storey tower element. The proposed building includes approximately 65 square metres of non-reisdential space at grade and 396 residential dwelling units.
You can send a written comment to the city planner, and you can ask to speak when this ward's community council hears the rezoning. That council recommends. City Council makes the decision.
Next sitting on the published 2026 schedule: Toronto and East York Community Council, 25 Nov 2026, 9:30 a.m., Committee Room 1, Toronto City Hall.
486 m away · 158 Soudan Ave · Toronto-St. Paul's
Asked 26 Mar 2025
Under Review
Site Plan Control for a 56-storey residential tower that will have a total of 46,547 square metres of residential gross floor area ("GFA") and a total of 674 total dwelling units (including the 13 required rental replacement units). See Related Rezoning file (25 135273 STE 12 OZ) Jan 2026 Revised Submission - Zoning…
Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.
527 m away · 758 Mount Pleasant Rd · Toronto-St. Paul's
Asked 5 Jul 2021
Under Review
Site Plan Approval for a 35-storey mixed-use building comprised of a 6-storey base building, and a 29-storey tower element. The proposed non-residential gross floor area is 208.37 square metres, and the proposed residential gross floor area is 28,692.73 square metres. A total of 398 residential dwelling units are…
Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.
527 m away · 758 Mount Pleasant Rd · Toronto-St. Paul's
Asked 23 Apr 2026
Under Review
Zoning By-law Amendment application to allow for the development of a 56-storey mixed-use building comprised of a 4-storey podium and a 52-storey tower element. The proposed building includes approximately 65 square metres of non-reisdential space at grade and 618 residential dwelling units.The site was subject to a…
You can send a written comment to the city planner, and you can ask to speak when this ward's community council hears the rezoning. That council recommends. City Council makes the decision.
Next sitting on the published 2026 schedule: Toronto and East York Community Council, 25 Nov 2026, 9:30 a.m., Committee Room 1, Toronto City Hall.
530 m away · 61 Brownlow Ave · Toronto-St. Paul's
Asked 25 Aug 2021
NOAC Issued
Site Plan application to permit a residential building with two towers, 59 and 55 storeys , comprising 1,374 residential units, daycare facility and a gross floor area of 97,194 square metres. The proposal involves rental replacement.
Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.
530 m away · 61 Brownlow Ave · Toronto-St. Paul's
Asked 10 Sep 2021
Under Review
*** Draft Plan of Standard Condominium to permit 384 residential units in a 35-storey residential building with a 2-level underground parking garage containing 69 vehicular parking spaces.
This is a condominium plan, usually tied to a rezoning. A written comment goes to the city planner. Height and use are argued on the rezoning, when there is one.
543 m away · 276 Merton St · Toronto-St. Paul's
Asked 16 Sep 2020
Under Review
INACTIVE Site Plan application to permit a 13-storey building (49.65 metres to the top of the mechanical penthouse). The proposal includes 91 residential units as well as 58 parking spaces (reduced from 92) in a two- level underground parking garage (reduced from 3-levels).
Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.
553 m away · 141 Davisville Ave · Toronto-St. Paul's
Asked 22 Jun 2022
Under Review
Proposed 32-storey infill tower. The existing 20-storey. 313-unit rental apartment building currently on site will be retained. The proposed building will include approximately 423 new dwelling units (in a mix of studio, one-bedroom, two-bedroom, and three-bedroom units) across 24,026 square metres of residential…
Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.
589 m away · 185 Balliol St · Toronto-St. Paul's
Asked 15 Sep 2020
Under Review
INACTIVE Application for Site Plan Approval of a proposed 35-storey mixed rental residential building, with retail at-grade along Pailton Cres, approximately 437 (previously 449 units) and 32.017.60m2 of GFA (previosuly 33,395m2 of GFA)
Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.
598 m away · 275 Merton St · Toronto-St. Paul's
Asked 20 May 2025
NOAC Issued
Site Plan for a 40-storey mixed use purpose built rental building with 494 dwelling units, of which 30% will be affordable rental units. A total gross floor area (GFA) of 31,321 m2 is proposed, including 132 m2 of ground floor non-residential GFA.
Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.
617 m away · 218 Merton St · Toronto-St. Paul's
Asked 28 Apr 2022
Under Review
Site Plan Approval for a 40-storey mixed-use building having a non-residential gross floor area of 347.1 square metres, and a residential gross floor area of 28,700 square metres. 434 residential dwelling units are proposed.
Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.
631 m away · 191 Eglinton Ave E · Toronto-St. Paul's
Asked 14 Jul 2022
Appeal Received
Rezoning for proposed 40-storey tower with an 8-storey podium and three-levels of underground parking. The proposal incorporates residential, retail, and office uses, and will replace the existing commercial/retail spaces. The building includes 479 units, 164 vehicular parking spaces, and 504 bicycle parking spaces.
This file is at the Ontario Land Tribunal. The next community council sitting is not the hearing.
631 m away · 191 Eglinton Ave E · Toronto-St. Paul's
Asked 6 Mar 2025
Under Review
Site Plan approval application for a 40-storey tower with an 8-storey podium and three-levels of underground parking. The proposal incorporates residential, retail, and office uses, and will replace the existing commercial/retail spaces. The building includes 479 units, 164 vehicular parking spaces, and 504 bicycle…
Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.
631 m away · 181 Eglinton Ave E · Toronto-St. Paul's
Asked 14 Jul 2022
Under Review
Site Plan Application for proposed 21-storey buidling and three-levels of underground parking, excluding mechanical penthouse. The proposal includes 11,242.7 square metres of residential and 237.4 square metres of retail use. The building includes 139 unit and 23 vehicular parking spaces.
Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.
660 m away · 180 Merton St · Toronto-St. Paul's
Asked 14 Mar 2025
Under Review
Site Plan Approval for a 36-storey mixed-use residential building, which includes the partial retention of the existing heritage building at 170 Merton Street. Overall, the proposal includes a total of 400 residential dwelling units and approximately 31,954 square metres of gross floor area, including 198.4 square…
Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.
671 m away · 155 Balliol St · Toronto-St. Paul's
Asked 14 Oct 2021
Under Review
Draft Plan of Subdivision for 3 lots.
You can send a written comment, and you can ask to speak at community council. City Council decides a plan of subdivision.
Next sitting on the published 2026 schedule: Toronto and East York Community Council, 25 Nov 2026, 9:30 a.m., Committee Room 1, Toronto City Hall.
671 m away · 155 Balliol St · Toronto-St. Paul's
Asked 14 Oct 2021
NOAC Issued
Site Plan Approval for a 37-storey mixed-use building having a non-residential gross floor area of 137 square metres and a residential gross floor area of 31095square metres. A total of 442 new residential dwelling units are proposed.
Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.
698 m away · 808 Mount Pleasant Rd · Toronto-St. Paul's
Asked 8 Oct 2021
Under Review
2 lots
You can send a written comment, and you can ask to speak at community council. City Council decides a plan of subdivision.
Next sitting on the published 2026 schedule: Toronto and East York Community Council, 25 Nov 2026, 9:30 a.m., Committee Room 1, Toronto City Hall.
Write Kai Zhou · [email protected].
698 m away · 808 Mount Pleasant Rd · Toronto-St. Paul's
Asked 27 Apr 2022
Under Review
Site Plan Approval for a 35-storey mixed-use building having a non-residential gross floor area of 1005 square metres, and a residential gross floor area of 31,514 square metres. 514 residential dwelling units are proposed.
Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.
Write Kai Zhou · [email protected].